What did we achieve?
- During this project, we installed and configured PowerCenter and PowerExchange for Dev,test and PRod environments
- Integrated the PowerCenter systems with the Bright Horizons LDAP repository
- Configured the roles accordingly for each group.
- Configured the PowerCenter systems to utilize the Bright Horizons SMTP Mail services.
- Configured PowerExchange for SalesForce.
- Created and configured backup nodes for the Test\QA and Production systems.
- Knowledge sharing sessions with employees.