What did we achieve?

  • During this project, we installed and configured PowerCenter and PowerExchange for Dev,test and PRod environments
  • Integrated the PowerCenter systems with the Bright Horizons LDAP repository
  • Configured the roles accordingly for each group.
  • Configured the PowerCenter systems to utilize the Bright Horizons SMTP Mail services.
  • Configured PowerExchange for SalesForce.
  • Created and configured backup nodes for the Test\QA and Production systems.
  • Knowledge sharing sessions with employees.